Tyre trolley and launchign gantry

Category
Full Span Method (FSM)
About This Project

Tyre trolley and launchign gantry with underbridge.

  • Cap. 600 to 1000 Ton
  • Span 25 to 35 m

Erection of Full span viaduct lines for High Speed Railway lines.

The equipment is composed by a low height transporter that feeds a wide rear leg launcher. The front short underbridge permits minimal discharged loads on the erected span.

Equipment design and/or fully manufactured by Wowjoint