Special Launching Carrier

Category
Full Span Method (FSM)
About This Project

Special launching carrier with underbridge

  • Cap. 600 to 1000 Ton
  • Span 25 to 35 m
  • Specially design for erection of viaducts in mountain areas and in tunnel sections

Erection of Full span viaduct lines for High Speed Railway lines, the Special carrier has the great advantage of being able to pick up directly the PC beam from site and erect it on piers.

The equipment can be easily and fast moved between viaduct lines, allows for contemporary erection of parallel viaducts and can erect span even inside tunnels.

Equipment design and/or fully manufactured by Wowjoint